Sichuan Golden-Elephant Sincerity Chemical Co., Ltd. Unveils Phase II of 300,000 Ton Cyanamide Project

Time:2022-11-15

In accordance with the requirements of laws and regulations such as the Environmental Protection Law of the People's Republic of China, the Environmental Impact Assessment Law of the People's Republic of China, the Regulations on Environmental Protection Management of Construction Projects, and the Measures for Public Participation in Environmental Impact Assessment, in order to widely solicit and understand the public's opinions on the environmental impact assessment work of the second phase of the 300,000-ton cyanamide project (90,000 tons of melamine and 10,000 tons of dicyandiamide) of Sichuan Golden-Elephant Sincerity Chemical Co., Ltd., the EIA information of the project is hereby publicized as follows:

1. Project name and summary

1. Project name: the second phase of the cyanamide project with an annual output of 300,000 tons (with an annual output of 90,000 tons of melamine and 10,000 tons of dicyandiamine).

2. Construction address: Meishan High-tech Industrial Park (West District), Sichuan Province

3. Construction content: With natural gas as raw material, in accordance with the circular industrial route of "natural gas-synthetic ammonia-urea-melamine-dicyandiamine", the advanced technology of green environmental protection, energy saving and low carbon, safety and reliability is adopted, and the relevant intermediate raw materials and product devices and supporting public and auxiliary projects are built to form an annual production capacity of 90,000 tons of melamine products and 10,000 tons of dicyandiamide products.

4. The total investment of the project: 171846 million yuan.

2. Existing projects and their environmental protection

The overall design and production capacity of the existing projects in Zone A, Zone B and Area C of Sichuan Golden Elephant Sincerity Chemical Co., Ltd. is 350,000 tons of synthetic ammonia (4 sets of units), 280,000 tons of urea (2 sets of units), 450,000 tons of nitric acid (3 sets of units), 480,000 tons of molten ammonium nitrate (2 sets), 250,000 tons of nitro compound fertilizer (binary) (1 set of units), 115,000 tons of melamine (3 sets of units), 60,000 tons of hydrogen peroxide (1 set of devices), 600,000 tons of compound fertilizer (ternary) (1 set of units), 80,000 tons of solid ammonium nitrate (1 plant), 10,000 tons of peracetic acid (1 set). It also supports the construction of water supply engineering, power supply and distribution engineering, gas supply engineering, steam supply system, desalinated water system, fire protection system and other public and auxiliary facilities, as well as storage and transportation projects such as liquid ammonia storage tank area and peracetic acid storage tank. According to the company's annual pollutant discharge permit implementation report, the exhaust gas, waste water and noise of each device of the existing project can be discharged up to the standard, and the solid waste is managed according to the corresponding requirements. The company has established an emergency hierarchical response system and an emergency plan, which provides a guarantee for reducing the environmental risk of the project and taking emergency measures in the event of an accident.

In summary, it can be seen that the existing ecological protection and pollution control measures of Sichuan Golden Elephant Sincerity Chemical Co., Ltd. are effective.

3. Working procedures and main contents of environmental impact assessment

The working process is divided into three stages: the preparation stage, the investigation, monitoring and evaluation stage, and the report preparation stage.

Main work content: analyze the environmental impact factors of the project according to the project content; Investigate and monitor the current status of environmental quality in the project location; Predict and analyze the main environmental impacts of the project, and propose environmental impact mitigation measures; Collect public comments; Put forward the conclusion of the environmental impact assessment of the project. Name of construction unit: Sichuan Golden Elephant Sincerity Chemical Co., Ltd

Fourth, the name and contact information of the construction unit

1. Name of construction unit: Sichuan Golden Elephant Sincerity Chemical Co., Ltd

2. Address: Meishan High-tech Industrial Park

3. Contact: Gao Lan

4. Phone: 028-38183770

5. E-mail: 724945598@qq.com

5. Name and contact information of the environmental impact assessment agency

1. Name of evaluation agency: Sichuan Huankeyuan Technology Co., Ltd

2. Address: 12th Floor, Block B, Changhong Science and Technology Building, No. 199, Tianfu Fourth Street, High-tech Zone, Chengdu

3. Contact: Mr. Li

4. Phone: 028-61332195

5. E-mail: 760206953@qq.com

6. Web link to the public comment form

See Annex 1

7. The main ways for the public to put forward opinions

During the publicity period, the public can submit their opinions and views on the construction and EIA work of the project to the construction unit and the EIA unit by telephone, letter, e-mail, etc. In order to further understand the specific opinions and suggestions of the public, the public is requested to provide detailed contact information as much as possible when expressing their opinions.

This publicity time is valid within 10 working days from the date of publicity, and the public who express their opinions should indicate the date of publication, real name and contact information, so as to give feedback as needed.

Sichuan Golden Elephant Sincerity Chemical Co., Ltd

November 15, 2022

Annex 1

Public comment form for environmental impact assessment of construction projects

Date

of filling out the form : YYYYYYYYYYYYYYYYYYYYYY  

the name of the project

Sichuan Golden Elephant Sincerity Chemical Co., Ltd

Phase II of the 300,000-tonne-per-year cyanamide project (90,000 tonnes of melamine and 10,000 tonnes of dicyandiamide).

This page is for public comment

suggestions and opinions related to the environmental impact and environmental protection measures of the project (Note: according to the "Measures for Public Participation in Environmental Impact Assessment", opinions or demands related to land acquisition and demolition, property, employment and other opinions or demands that are not related to the project EIA do not belong to the public participation of the project EIA)

(Please do not involve state secrets, trade secrets, personal privacy, etc. when filling in this content, if this page is not enough, you can attach another page).

This page is public information

(1) If the public is a citizen, please fill in the following information

last name

 

the ID number

 

valid contact information

(phone number or email address).

 

address of habitual residence

XX Province, XX City, XX County (District, City), XX Township (Town, Street), XX Village (Neighborhood Committee), XX Villager Group (Community).

whether or not to consent to the disclosure of personal information

(Agree or disagree).

 

 

 

(if you don't fill it, you will default to disagree).

(2) If the public is a legal person or other organization, please fill in the following information

the name of the organization

 

the industrial and commercial registration number or the unified social credit code

 

valid contact information

(phone number or email address).

 

address

No. XX, XX Road, XX Township, XX County, XX City, XX Province

Note: In principle, the information of legal persons or other organizations can be disclosed, and if it involves information that cannot be disclosed, please indicate the legal basis and the specific information that cannot be disclosed in this column.

     

 

 

 