Draft Proposal for Public Input on GESC Natural Gas Pipeline Environmental Impact Assessment

Time:2023-09-04

The Environmental Impact Assessment Report for the GESC Sincerity Natural Gas Pipeline Project (draft for soliciting opinions) has been completed. According to the relevant provisions of the Public Participation Measures for Environmental Impact Assessment, the second round of public participation in environmental impact assessment will be conducted to solicit public opinions

  1.  Project situation

A new long-distance natural gas pipeline will be built starting from the Meishan Off load Station of PetroChina and ending at the south side of the D area project of the company. The pipeline is approximately 6.25km long, with a design pressure of 6.3Mpa, an outer diameter of 406mm, a wall thickness of 10mm, and a gas transmission capacity of 3 million cubic meters per day.

(2) Public access to information

The electronic version of the Environmental Impact Assessment Report for the GESC Sincerity Natural Gas Pipeline Project (draft for comments) can be viewed:

Link:https://pan.baidu.com/s/1tpx6gzX71PNqbT6rEwiRmw

Extraction code: l4v3

Link to the Public Opinion Form for Environmental Impact Assessment of Construction Projects:

Link: https://pan.baidu.com/s/1gTLfH3L1GNgSXV-Xwg107A

Extraction code: l4v3

Link to the Public Opinion Form for Environmental Impact Assessment of Construction Projects:

Link: https://pan.baidu.com/s/1gTLfH3L1GNgSXV-Xwg107A

Extraction code: 8iti

(3)Public scope for soliciting opinions

Residents, enterprises, institutions, and related affected public are within the evaluation scope.

 

135/10000

135/10000 real-time translation 4. Ways and channels for submitting public opinion forms. If you have any opinions or views on the project, please provide feedback to the construction unit or environmental impact assessment unit. The public who express their opinions should indicate the publication date, real name, and feedback contact information as needed. The public opinion form can be submitted in any of the following ways: 1. Email 2. Mailing letters 3. Submit the translation in person 4 Ways and channels for submitting public opinion forms. If you have any opinions or views on the project, please provide feedback to the construction unit or environmental impact assessment unit. The public who express their opinions should indicate the publication date, real name, and contact information for feedback as needed. The Public Opinion Form can be submitted through any of the following methods:1. Email2. Mailing letters3. Submit in person

  1. Ways and channels for submitting public opinion forms

If you have any opinions or views on the project, please provide feedback to the construction unit or environmental impact assessment unit. The public who express their opinions should indicate the publication date, real name, and contact information for feedback as needed. The Public Opinion Form can be submitted through any of the following methods:

1. Email

2. Mailing letters

3. Submit in person

The "Public Comment Form" submitted in the above three ways can be submitted to the construction unit or EIA unit according to the following contact information.

1. Name and contact information of the construction unit

Construction unit: Sichuan Golden-Elephant Sincerity Chemical Co., Ltd

Contact: Zheng Ke

Contact number: 15984331312

Mailing address: Meishan High-tech Industrial Park (West District), Sichuan Province

2. The name and contact information of the unit preparing the environmental impact report

Evaluation unit: Sinoma Geological Engineering Exploration and Research Institute Co., Ltd

Contact: Wang Gong

Contact number: 13699464099

E-mail: 373395676@qq.com

Mailing address: 401, 402, Block A, Rolling Stone Tiandi Building, Building 1, No. 50, Wangjing West Road, Chaoyang District, Beijing

5. The start and end time for the public to submit comments

If you have comments and suggestions on the draft of the environmental impact report of this project, please feedback the "Public Comment Form" to the construction unit or EIA unit in the manner described in Section 4 of this announcement within 10 working days from the date of release of this announcement.

Sichuan Golden Elephant Sincerity Chemical Co., Ltd

September 4, 2023

Keywords: Draft Proposal for Public Input on GESC Natural Gas Pipeline Environmental Impact Assessment